Bathroom Remodel Cost Calculator
Pick your bathroom type and quality tier to get an instant cost estimate — including the 30% premium for moving walls or plumbing.
Last updated: June 2026
Toilet, double vanity, separate tub + shower.
Mid-range fixtures, ceramic tile, semi-custom vanity
Bathroom Remodel Estimate
Price data sources: HomeAdvisor 2026 Bathroom Remodel Cost · Angi 2026 Bathroom Remodel Guide · NKBA Bathroom Remodel Trends · Remodeling Magazine 2026 Cost vs Value
Last verified: June 2026
Quality Tier Comparison (2026)
| Tier | $/sq ft | What you get |
|---|---|---|
| Budget | $125-$200 | Big-box store fixtures, basic tile, stock vanity |
| Standard | $200-$300 | Mid-range fixtures, ceramic tile, semi-custom vanity |
| Premium | $300-$450 | High-end fixtures, natural stone tile, custom cabinetry |
| Luxury | $450-$700 | Designer fixtures, heated floors, smart technology |
Cost Breakdown
| Component | % of Total | What it covers |
|---|---|---|
| Fixtures (tub, shower, toilet, vanity) | 30-35% | The biggest line item. Tubs $400-$3,000, vanities $300-$3,000 |
| Labor (plumbing + electrical + tile) | 35-45% | Multiple trades: plumber, electrician, tile setter, carpenter |
| Materials (tile, drywall, paint) | 15-20% | Tile $2-$30/sq ft, waterproofing, cement board, grout |
| Permits & disposal | 5-10% | Building permit $200-$800, dumpster rental $300-$600 |
How Location Affects Your Cost
| Region | Labor | Materials |
|---|---|---|
| Midwest | 1x | 1x |
| Southeast | 0.9x | 0.95x |
| Southwest | 1.05x | 1.1x |
| Northeast | 1.3x | 1.2x |
| West Coast | 1.4x | 1.25x |
To adjust: multiply the calculator's total by your region's average multiplier. Source: RSMeans City Cost Indexes 2025, adjusted for 2026.
Remodeling contractor? Bid bathrooms with confidence.
JobTread tracks fixture specifications, trade scheduling (plumber → electrician → tile → carpenter), and permit status for bathroom remodels. Generate proposals with fixture allowance options and change-order tracking.
Affiliate link — we may earn a commission if you sign up.
Try JobTread FreeHow to Save on a Bathroom Remodel
Keep the existing layout: Moving plumbing fixtures adds 25-30% to the project cost. The single biggest money-saver is keeping toilet, sink, and shower in their current locations.
Choose mid-range fixtures: A $800 mid-range toilet performs identically to a $2,000 designer toilet. The difference is aesthetics, not function. Spend the savings on tile quality or lighting instead.
Refinish instead of replace: Bathtub refinishing ($300-$600) costs 80% less than replacement ($1,500-$3,000). Same for existing cabinets — refacing ($1,500-$4,000) beats custom replacement ($5,000-$15,000).
Don't skip waterproofing: Proper waterproofing (Kerdi, RedGard) costs $200-$500 but prevents $5,000-$15,000 in water damage. This is the one area where DIY shortcuts cause catastrophic failures.
Frequently Asked Questions
How much does a bathroom remodel cost?
Bathroom remodels cost $6,000 to $30,000+ in 2026, depending on bathroom size and quality tier. A small full bathroom (40 sq ft) with standard materials runs $8,000-$12,000. A standard full bath (60 sq ft) with premium finishes costs $18,000-$27,000. Master bathrooms (120+ sq ft) with luxury features can exceed $50,000. The average US bathroom remodel costs $11,000-$18,000. Moving plumbing or walls adds 25-30%. Use the calculator above for exact estimates.
How much does it cost to remodel a small bathroom?
A small full bathroom (5'×8', ~40 sq ft) costs $5,000 to $12,000 to remodel in 2026. Budget remodel (big-box fixtures, basic tile) runs $5,000-$8,000. Standard remodel (mid-range fixtures, ceramic tile) costs $8,000-$12,000. Premium small bath runs $12,000-$18,000. The small size limits material costs but labor stays high because the same trades are needed regardless of size. Powder rooms (half baths) cost $3,000-$8,000 since there's no shower/tub.
How much does a master bathroom remodel cost?
Master bathroom remodels cost $20,000 to $50,000+ in 2026. The large space (120+ sq ft) allows for separate soaking tub, walk-in shower, double vanity, and water closet. Luxury master baths with heated floors, smart mirrors, and designer fixtures can exceed $80,000. The biggest cost drivers: custom cabinetry ($5,000-$15,000), walk-in shower with frameless glass ($5,000-$15,000), and freestanding tub ($1,500-$5,000). Plan 5-8 weeks for completion.
What is the most expensive part of a bathroom remodel?
Labor is typically the most expensive component (35-45% of total cost) because bathroom remodels require multiple specialized trades: plumber, electrician, tile setter, and carpenter. Each trade charges $75-$150/hour. The second biggest cost is fixtures (30-35%): a single freestanding tub can cost $1,500-$5,000, a custom vanity runs $1,500-$5,000, and a frameless glass shower enclosure adds $1,500-$4,000. To save money, keep the existing layout (moving plumbing is very expensive) and choose mid-range fixtures instead of designer brands.
Is a bathroom remodel worth it for resale?
Yes — bathroom remodels have one of the highest ROIs of any home improvement. A mid-range bathroom remodel recovers 60-70% of cost at resale (Remodeling Magazine 2026 Cost vs Value Report). An upscale master bath recovers 50-60%. But the real value is in sale speed: homes with updated bathrooms sell 20-30% faster than those with dated baths. If you're selling within 2 years, focus on cosmetic updates (paint, fixtures, lighting) for 50% of the cost of a full remodel. If staying 5+ years, invest in what you'll enjoy.
How long does a bathroom remodel take?
Bathroom remodels take 2-8 weeks depending on scope. Powder room: 1-2 weeks. Small full bath: 2-3 weeks. Standard full bath: 3-5 weeks. Master bath: 5-8 weeks. The timeline includes: demolition (2-3 days), rough plumbing/electrical (3-5 days), inspection (1-2 days wait), waterproofing + tile (5-7 days), fixture installation (2-3 days), and final touches (2-3 days). Delays are common due to trade scheduling, material delivery, and inspection wait times. Add 20% buffer to any contractor's timeline estimate.
Can I remodel a bathroom myself?
Partial DIY is possible for experienced homeowners. You can handle: demolition, painting, and simple fixture swaps. But plumbing and electrical work requires licensed professionals in most jurisdictions (and permits). Tile setting is a skill that takes years to master — DIY tile in wet areas often fails within 2-3 years. The typical DIY approach: hire a GC for plumbing/electrical/tile, do demo/paint/cleanup yourself. This saves 15-25% vs full-contractor but adds 2-4 weeks to the timeline.
Estimating kitchen remodel?
Browse CalculatorsCompare estimating software
Software Cost CalculatorMarcus Webb
Lead Reviewer & Construction Tech Analyst
Marcus spent 8 years working with general contractors and trade businesses before focusing on construction technology. He has personally tested 30+ estimating and project management tools with real project data.
About Marcus →